We designed, engineered and fabricated the storage solution for the spare cable for one of the world’s largest offshore windfarms

As wind farms move further offshore and rapidly grow in size and scale, the amount of array and export cabling will increase proportionately. Spare cables will require storage in controlled environments for the life of the windfarm.

Easy access for efficient unloading

With an unrestricted harbour access and plentiful quay space, cables of up to 240mm in diameter can be unloaded from the adjacent quay and stored in a specially constructed facility.

Flexible storage facilities

The facility contains four bullrings with diameters of 8m, 10m, 13m and 18m; all are 3.2m in height. We work with the client to specify the exact requirements of the cable to be housed.

Immediate access

The cables housed in the cable storage area can be easily removed using a hydraulically operated reel system. The time required from the alert of an issue to taking the cable offshore is minimal.

© Manor Renewable Energy Ltd, 2019 / Company no. 08753840, registered in England and Wales, Registered Office: Unity Chambers, 34 High East Street, Dorchester, Dorset, DT1 1HA
/ Company with Management System Certified by DNV GL – ISO 9001, ISO 14001, ISO 45001 / GDPR Privacy Notice
/ Photography © CHPV Offshore Filming & Photography Services / Website by Ascender Design
ISO 9001 14001 45001